Posted: February 16th, 2010   |   Category: Featured Projects

Seawall 1

Sea Wall - Project 3 - View 2

Sea Wall installed on Lake Hartwell includes products offered by Redi-Rock.

Sea Wall - Project 3

Sea Wall - Project 6

Boat Dock Works was contracted by The City of Gainesville to install this 750′ composite sea wall for the Long Wood Cove rehabilitation project. Boat Dock Works is approved through The U.S. Army Corp. of Engineers, Georgia E.P.D., and has been involved with many local and state projects.

Boat Dock Works was contracted by The City of Gainesville to install this 750' composite sea wall for the Long Wood Cove rehabilitation project. Boat Dock Works is approved through The U.S. Army Corps. of Engineers, Georgia E.P.D., and has been involved with many local and state projects.

Boat Dock Works has been involved in projects such as this Bio-Engineering Shoreline Stabilization for the U.S. Army Corp. of Engineers, Savanna District. Here we used imported clay, Rip Rap, surge stone, and low-land switch grass to build back and stabilize eroded shorelines on Lake Hartwell.

Boat Dock Works has been involved in projects such as this Bio-Engineering Shoreline Stabilization for the U.S. Army Corps. of Engineers, Savanna District. Here we used inported clay, Rip Rap, surge stone, and low-land switch grass to build back and stabilize eroded shorelines on Lake Hartwell.

 

 

 

 